Beacon Educational Technologies Inc specializes in developing software for assisting Educational Institutions in their Administration. They have a range of 6 products for the administration of Educational Institutions. 

 
Problem Situation

Beacon Educational Technologies Inc. wanted to upgrade their technology. They were looking for a team of Software Developers to upgrade their products. This included feature enhancement, GUI modification and unifying all products to one technology, through which they can combine all products to evolve an Institution Administration Application. All these products were in use and they had to support compatibility and seamless upgrade of the existing applications without any loss of data. They were also having budgetary constraints in upgrading their products.

Solutions

RDS was granted the task of upgrading a 16 bit application to Visual Basic 6.0 and Microsoft Database as the backend. The existing application Use of Buildings 2 was Re-Engineered. New features were included, a grand new look and feel was provided, and a seamless process of Upgradation from existing application was developed. Rational Unified Process was used for the Software Development Life Cycle (SDLC). Rational Rose was used for design of the application.

Value to the customer

The re-engineered application with a new look, new features and seamless upgrade feature was delivered on time and delivered at a cost less than 60% of conventional development. Users of the application were able to upgrade their old application to the new version and had their data intact in their new version of the software.

Highlights
RDS developed a website for the client
A new GUI framework was developed; Beacon plans to use it for all its products.
Beacon was introduced to the concept of Testing, Automated testing, testing tools, testing plan and test bed.

In addition to the on-line project management, bi-weekly meetings updating project progress, frequent face to face meetings for requirement analysis design and project scheduling.

16 hours work day achieved through operations at different time zones.
Developed a database conversion utility.
Developed a Smart Installation Method which could be used as a standard for the upgradation of other products of Beacon.
Complete testing and qualification before the release of a build.
Use of an issue tracking mechanism for effective software maintenance. Prior to RDS involvement, Beacon did not follow any method of issue tracking.
For the first project the onshore to offshore product development ratio was 30% to 70% and for the second project this ratio is 20% to 80%.